If you spent years idling on Redwood Road watching brake lights stretch toward Utah County, you already appreciate how much changed when the barriers lifted on December 20, 2025. That 4-mile Mountain View Corridor extension connecting Porter Rockwell Blvd in Herriman straight to 2100 North in Lehi opened four months ahead of schedule—and throughout 2026 and into 2027, commuters are feeling both the time savings and the next UDOT construction wave right at the county line.
In This Scoop:
Freeway Access Between Herriman & Lehi
Unlike the signalized frontage intersections farther north, UDOT’s 4-mile Mountain View Corridor link between Porter Rockwell Blvd and 2100 North operates as a full 65+ MPH freeway with zero stoplights. Since opening in December 2025, West Side drivers heading to Silicon Slopes have enjoyed an uninterrupted highway bypass around Redwood Road congestion.
Why This Stretch Opened 4 Months Early
Originally slated for Spring 2026, UDOT crews finished the segment early thanks to mild winter grading weather and early land access arranged with the National Guard near Camp Williams. Cutting through military-adjacent scheduling hurdles shaved months off the calendar and put commuters on asphalt before winter 2025 wrapped up.
2026–2028 Bottleneck: 2100 North Construction
While the Herriman-to-Lehi stretch flows freely today, UDOT is actively converting 2100 North in Lehi into a full freeway connector to I-15 in work scheduled to run through 2028. Expect ongoing orange barrels and lane shifts once you exit onto 2100 North heading east toward I-15.
Corridor Snapshot Table
Here is how the completed Porter Rockwell-to-2100 North freeway compares with the active I-15 connector work underway through 2028.
| Segment | 2026–2027 Status | What Drivers Experience |
|---|---|---|
| Porter Rockwell Blvd to 2100 N | Open (Dec 20, 2025) | 4 miles of stoplight-free 65+ MPH freeway |
| 2100 North Eastbound to I-15 | Active Construction (Through 2028) | Ongoing freeway-conversion lane shifts |
Why This Matters for South Valley
Direct freeway access between Herriman and Lehi strengthens West Side livability in 2026–2027 by linking residential neighborhoods directly to Silicon Slopes employment hubs. You can also pair these highway gains with local updates on the Juniper Crest Road Extension and Jordan School District enrollment trends.
Quick Local FAQ
When did the Mountain View Corridor extension to 2100 North open?
The 4-mile segment between Porter Rockwell Blvd in Herriman and 2100 North in Lehi opened to traffic on December 20, 2025—four months ahead of schedule.
Are there stoplights on the new Mountain View Corridor section to Lehi?
No—this 4-mile stretch was built as a full 65+ MPH freeway without traffic signals from day one.
How long will UDOT construction on 2100 North in Lehi continue?
UDOT’s conversion of 2100 North into a freeway connecting to I-15 is scheduled to run through 2028.
Mountain View Corridor & Your Herriman Home Search
With direct freeway access into Lehi now open, western South Valley neighborhoods offer faster commutes than ever. Browse active Herriman listings anytime on my local site.
See you around the neighborhood (hopefully cruising light-free down Mountain View Corridor),
Terry Thompson
Your South Valley Realtor & Neighbor